CazVid - Video Resumes That Work
CazVidThis is my profile
ENESPT
Contact via CazVid
S

Seiied

Diamond & Geotechnical Driller

Contact

Muscat, Muscat, Oman
Available on CazVid
Contact via CazVid

Skills

Surface and underground diamond core drilling
Mineral exploration
Wireline coring
BQ, NQ, HQ and PQ
Deep-hole drilling

Languages

PersianNative
AzerbaijaniNative
TurkishNative
EnglishProfessional Working Proficiency
ArabicGood understanding

Summary

Diamond & Geotechnical Driller open to new opportunities

Experience

  • DIAMOND & GEOTECHNICAL DRILLER
    Jan 2026 - Present
    PREMIER INTERNATIONAL PROJECTS COMPANY

    Operate Fraste Mito 40, Fraste Mito 60, Kailar and Levent underground rigs on construction, dam and geotechnical projects.. Personally prepare drilling reports and maintain operational records; carry out Lugeon testing and complete the associated test logging and documentation.. Perform drilling, SPT, packer and Le Franc testing, field logging, equipment checks and operational troubleshooting.

  • DIAMOND / GEOTECHNICAL DRILLER & RIG MAINTAINER
    May 2025 - Dec 2025
    IR DRILLERHAND COMPANY

    Delivered drilling operations and rig maintenance across Yengejeh Copper Azarshahr, Iran (Titan, CS15), Yelgarshi Copper & Gold Myaneh, Iran (GY300, D900), Pars Gold & Copper Neishabour, Iran (Christensen U6, Solmak EX3/EX4, Sandvik DE740) and Al Beydha Dam, Al Nakhil, Oman (Kaila and Tigger rigs).. At Al Beydha Dam, was responsible for geotechnical logging reports and carrying out/documenting SPT, Le Franc and Lugeon tests.. At the Pars project in Neyshabur, used Triple Tube coring in difficult shale/clay interbeds within hard siliceous formations; worked to project acceptance thresholds of at least 90% recovery per 5 m core run/box and 95% per 100 m.. Performed rig setup, independent mechanical/hydraulic troubleshooting and onsite technical problem-solving.

  • GEOTECHNICAL DRILLER & RIG MAINTAINER
    May 2024 - Apr 2025
    ARIA GEOTECH AFRA COMPANY

    Conducted geotechnical drilling using the conventional metric drilling method to a maximum depth of 90 m; operated SKB 5-4, GY300 and D750 rigs.. Personally prepared drilling records and reports and recorded field-test results for submission to the Tehran Province Construction Engineering Organization IRCEO.. Carried out soil investigation, soil sampling, onsite testing and mechanical/hydraulic equipment maintenance, including work at Hoz-e Soltan Lake.

  • DIAMOND DRILLER & CREW SUPERVISOR
    Dec 2023 - Apr 2024
    HAFAR GOSTAR COMPANY (IMIDRO CONTRACTOR)

    Conducted gold-exploration diamond core drilling to 300 m and supervised drilling crews and daily site operations.. Used Triple Tube coring in challenging hydrothermal and clay-rich/muddy formations, working to a project requirement of at least 90% core recovery for borehole acceptance.. Responsible, in Crew Supervisor assignments, for core boxing and marking, Core Recovery and RQD calculations, and daily, weekly and monthly drilling reports, shift logbooks and daily rig records.. Operated Atlas Copco CS14 and Melis D900 rigs; supported rig maintenance, troubleshooting and hydrothermal/mud coring.

  • DIAMOND DRILLER / CREW SUPERVISOR / RIG MAINTAINER
    Jan 2023 - Dec 2023
    DEHYARI BAFGH COMPANY

    Worked on Sechahun, Choghart, A8 and Chadormaloo iron-exploration sites.. Operated MD [contact hidden] and Atlas Copco CS14 rigs; carried out rig maintenance, troubleshooting and crew/site supervision.. Completed supervisory documentation and drilling records, including core boxing, Core Recovery/RQD calculations and operational reporting.

  • DIAMOND DRILLER & CREW SUPERVISOR
    Sep 2022 - Jan 2023
    DANESH GOSTAR ZAMIN COMPANY

    Conducted copper-exploration diamond drilling to 500 m; supervised daily drilling operations and operated Atlas Copco CS14 and R&D 6 rigs.. Maintained core and operational records and prepared required drilling reports while assigned as Crew Supervisor.

  • DIAMOND DRILLER & CREW SUPERVISOR
    Sep 2021 - Sep 2022
    DANESH GOSTAR ZAMIN COMPANY

    Conducted iron-exploration diamond core drilling to 700 m; operated Atlas Copco CS14 and CSK CS15 rigs and supported maintenance and troubleshooting.. Performed crew-supervision documentation, including core boxing, Core Recovery/RQD calculations and drilling reports.

  • GEOTECHNICAL DRILLER & TEST LOGGER
    Jul 2021 - Sep 2021
    GHADIAN OMGH COMPANY

    Performed geotechnical drilling and site investigation to 40 m; operated GY300, carried out test logging and recorded drilling data.

  • DIAMOND DRILLER & CREW SUPERVISOR
    Feb 2020 - Sep 2021
    DANESH GOSTAR ZAMIN COMPANY

    Assigned across concurrent project sites under the same employer and moved between sites as project requirements changed.. Khanamrood Gold & Silver (Feb 2020–Sep 2021): diamond drilling to 200 m using Atlas Copco CS14.. Taftan Volcano Gold (Sep 2020–Jul 2021): diamond drilling to 300 m using Atlas Copco CS14 and CSK CS15.. As Crew Supervisor, maintained core records, recovery/RQD calculations and operational reporting.

  • ASSISTANT DRILLER / GEOTECHNICAL DRILLER
    May 2018 - Dec 2019
    ZAHIR BAKHTAR COMPANY

    Supported diamond and geotechnical drilling, soil investigations and equipment setup; operated XY2B rig.

Education

  • BSc, Business Information Technology
    Completed 2010
    UCTI / JAKRI Universities, Kuala Lumpur, Malaysia
  • Higher Diploma, Advanced Systems Management
    Aptech, India
Published on CazVid - Nov 22, 2026
https://cazvid.com/cazume/seiied-ali-sondosi-cbfe9c
Contact Seiied