Este perfil está escrito en inglés
Senior Site Engineer
Demonstrated experience with Auto Cad.
Demonstrated experience with STAAD Pro.
Demonstrated experience with CCC.
Demonstrated experience with Construction Supervision.
Demonstrated experience with Multistoried Residential Buildings.
Senior Site Engineer open to new opportunities
Project: Papermill Plant Ayodhya for Pakka Ltd. Ayodhya, featuring Softwood Storage tank, Softwood Pulper Godown, Lime mud washer Building and Recovery boiler Drain.. Experience of making Layout of footings and columns. Estimating the value of cement sand and concrete.. Estimating the Quantity of steel.. Arrangement of manpower for site work.. Checking the steel in beam and slab before casting.. Preparing Bar Bending Schedule.. Plotting Line Level on Construction Site.. Experience of Brick Coba in Toilet for water proofing. Supervision of Construction work.. Allotting works to labors.. Supervising quality inspection as well as safety and health concern at site.. Estimate exact quantity of concrete before concreting work.. Checking technical designs and drawings to ensure that they are followed correctly.. Experience of Brick work, Plaster work.. Checking & Arranging Equipment before concreting work start.
Project: G+5 and G+6 floor Residential building Construction; G+5 and G+6 Floor Residential Building and G+2 bunglow Projects. Client: Jal Nigam Rithala, Delhi.. Preparing Bar Bending Schedule.. Plotting Line Level on Construction Site.. Interpretation of Drawing.. Supervision of Construction work.. Allotting works to labors.. Supervising quality inspection as well as safety and health concern at site.. Estimate exact quantity of concrete before concreting work.. Checking technical designs and drawings to ensure that they are followed correctly.. Experience of Brick work, Plaster work.. Checking & Arranging Equipment before concreting work start.
Project: Waste Water Treatment Plant (WWTP), Rehabilitation and Up-Gradation of Rithala Phase-I (182MLD) Waste Water Treatment Plant with effluent Standards of BOD -10mg/L or better under yap (III) Project (Package-R2).. Interpretation of Drawing.. Preparing Bar Bending Schedule.. Allotting works to labors.. Supervision of Construction work.. Preparing schedule of material used and available.. Plotting line level on construction site.. Preparing work chart schedule.. Experience of Brick work, Plaster work. Experience of casting of Cable trench, Return Activated Sludge Pump House, Drain Channel, Column, Beam, PCC, Slab. Experience of Casting of Raft footing. Estimate exact quantity of concrete before concreting work.. Checking & Arranging Equipment before concreting work start.. Supervision of curing process.. Keeping note of each and every casting work.. Checking technical designs and drawings to ensure that they are followed correctly.. Preparing site reports and filling in other paperwork.. Supervising the classification as well as requirement of materials as well as plant.. Organizing the work as well as effectively managing the plant as well as site facilities so as to fulfill set time limits.. Supervising quality inspection as well as safety and health concern at site.
Project: Execution work of HDPE Pipeline (90-900 mm Dia.) Laying and Fixing of HDPE Manholes for Nagar Nigam, Kanpur.. Experience of Laying high density polyethylene pipe (HDPE) by open cut and trenchless pipe laying (90-900 mm dia) by horizontal direction drilling (HDD) machine.. Meeting with clients to define pipeline requirements.. Perform quality control assessments and ensuring that the pipeline comply with all technical and safety regulations.. Conducting Field density test.. Ploting line level on construction site. Performing maintenance repaires and upgrades to pipe lines as needed.. Organizing materials and ensuring site safe and clean.. Preparing estimates and ensuring appropriate materials and tools are available.. Providing technical advice and suggestions for improvement on particular projects.. Delegating task s and scheduling meetings and training sessions where required.. Completing quality assurance and proving feedback to the team.
Project: Excution of Finishing Work of G+3 Residential Building.. Read, interpret, and implement architectural, structural, and interior working drawings (Good for Construction / GFC drawings).. Supervise daily on-site activities including false ceilings, flooring, partitioning (drywall/glass), tiling, painting, and woodwork/joinery.. Coordinate with electrical, plumbing, HVAC, and fire-fighting teams to ensure services are integrated before closing ceilings or walls.. Inspect incoming materials (plywood, laminates, marbles, paints, fixtures) against approved material boards and samples.. Assign daily targets to specialized trade contractors (carpenters, electricians, plumbers, painters, POP workers).. Track project progress against the baseline master schedule to prevent delays.. Calculate material quantities required to avoid over-ordering, wastage, or material shortages.
Project: Bridge Construction, C.O.D R.O.B NH at 79D for U.P. P.W.D., NH Division, Kanpur.. Supervision of Construction work.. Allotting work to labors.. Prepare daily progress report of site work.. Plotting line-level on construction site.. Preparing bar bending schedule.. Keeping note of each and every casting work.. Preparing schedule of Material Used and available.. Preparing work chart schedule.. Estimate exact quantity of concrete before concreting work.. Checking & Arranging Equipment before concreting work start.
Project: Bridge Construction, C.O.D R.O.B NH at 79D for U.P. P.W.D., NH Division, Kanpur.. Supervision of Construction work.. Allotting work to labors.. Prepare daily progress report of site work.. Plotting line-level on construction site.. Preparing bar bending schedule.. Keeping note of each and every casting work.. Preparing schedule of Material Used and available.. Preparing work chart schedule.. Estimate exact quantity of concrete before concreting work.. Checking & Arranging Equipment before concreting work start.