Apprentice, Plumber
Demonstrated experience with Installation of geysers.
Demonstrated experience with Pipe welding and cutting.
Demonstrated experience with Plumbing system inspection.
Demonstrated experience with Installation of solar geysers.
Demonstrated experience with Drainage pipe laying.
Professional profile
Installation, repair and maintenance of High pressure and low pressure geyser.. Connection of hot and cold water supply inside building using copper pipes of different sizes. Maintaining records of work performed, material used, and time spent on each project.. Installation and repair bathroom, kitchen and industrial fixtures such as bathtubs, basins, sinks, showers, and water closets.. Inspect plumbing systems for leaks, blockage, and malfunctions, and perform corrective actions.. Cut, weld, thread, assemble, and join pipes using hand and power tools.. Ensure all plumbing work complies with safety standards, building codes, and regulations.. Repairing of High Density Polyethylene (HDPE) main cold water supply underground pipes according to required sizes.. Repairing leaking pipes by clamping to prevent leakage.. Maintenance of Underground P. V. C drainage systems.
Mark-out, cutting, and connecting cold and hot water supply pipes using 15mm pex pipe.. Installation of bath taps, water closet, showers and connecting sink pipes.. Connection of solar ray geyser using 20 mm copper pipes.. Cut, weld, thread, assemble, and join pipes using correct tools and equipment.. Commissioning of the geyser (Installation of vacuum tubes).. Laying of underground drainage pipes.. Unblocking of blocked drain, baths and showers.. Installation of municipal water meter and connecting water supply pipes from main meter outside the house to the inside using 15mm poly-pipes.. Connecting cold and hot water supply pipes from inside building to the solar geyser though ceiling (roof work).. Installation of bath tap mixer, shower taps, sink taps and garden tap.
Levelling of a pavement using a dumpy level and a levelling staff to locate the highest and lowest points.. Setting out of a building using the pegging method, building line, and cement to transfer points from the drawing plan to the ground according to the required dimensions.. Setting out of plumbing underground pipes before excavation.. Installation of copper pipes, plumbing floor tubing, back-to-back PVC pipes, sinks, cisterns, bathtubs and basin.. Measuring of angles, horizontal and vertical planes using a total station.. Finishing-painting of walls, door, door frames, steel window frames, steel fixing and ceiling.. Soil testing in the trenches before the pouring of concrete and cut & fill method to reach the required level.. Setting out of brickwork before bricklayers can start building.