CazVid - Video Resumes That Work
CazVidEste é o meu perfil
ENESPT
Contato pela CazVid

Este perfil está escrito em inglês

Grant

Head Blockman

Contato

Boksburg, Gauteng, South Africa
Disponível na CazVid
Contato pela CazVid

Competências

Project Management

Demonstrated experience with Project Management.

Communication

Demonstrated experience with Communication.

Teamwork and Collaboration

Demonstrated experience with Teamwork and Collaboration.

Problem-Solving

Demonstrated experience with Problem-Solving.

Project Planning

Demonstrated experience with Project Planning.

Formação acadêmica

matric
umalusi
2019 - 2019
skid steer
Nirvana
2024 - 2024
Lift truck
Nirvana
2024 - 2024

Idiomas

English70%
Afrikaans40%

Resumo

Professional profile

Experiência

Head Blockman

meet buddies
Jan 2019 - Feb 2021

Supervised the breaking down of carcasses (beef, lamb, pork, and poultry), portioning, deboning, trimming, mincing, and production of value-added products including boerewors, sausages, biltong, and specialty cuts to meet store specifications and customer demand.. Managed daily inventory, stock rotation, ordering, and waste reduction, achieving a consistent reduction in shrinkage and maintaining optimal stock levels to support sales targets.. Trained and mentored junior blockmen on advanced cutting techniques, bandsaw operation, portion control, and customer service.. Handled customer interactions on the shop floor, providing expert advice on meat cuts, preparation methods, and custom orders while maintaining high service standards.. Ensured full compliance with health, safety, and company policies, conducting regular equipment maintenance, cleaning schedules, and quality checks.. Collaborated with store management on merchandising, promotions, and seasonal planning to drive butchery department sales.

Maintenance Operator

SA Precious Metals
Jan 2022 - Aug 2024

Performed preventive, corrective, and predictive maintenance on critical refinery equipment, including induction furnaces, electrolytic cells, acid digestion tanks, boilers, pumps, agitators, filtration systems, piping, valves, and ventilation units.. Conducted routine inspections, troubleshooting, and repairs on mechanical and instrumentation systems to minimise downtime and ensure continuous operation in a 24/7 refining environment.. Utilised CMMS (e.g., SAP/Pragma) to plan and execute scheduled maintenance, record work history, manage spares inventory, and track equipment performance.. Executed major shutdown and overhaul activities, including disassembly, inspection, re-lining, and re-assembly of electrolytic cells and furnace components.. Applied safety protocols in compliance with the Mine Health and Safety Act (MHSA), including Lock-Out/Tag-Out (LOTO), confined space entry, hot work permits, and hazardous chemical handling (acids and fluxes).. Performed root cause failure analysis on recurring equipment issues and implemented corrective actions to improve reliability and reduce repeat failures.. Collaborated with process operators, engineers, and metallurgy teams to coordinate maintenance windows and support production targets.. Maintained housekeeping and contamination control standards in a precious metals environment to uphold chain of custody and quality requirements.

Reline supervisor

Ares International
Jan 2024 - Jan 2025

Supervised teams of 15–30 reliners, contractors, and artisans during SAG, Ball mill relining activities, ensuring safe, efficient, and high-quality execution of liner installations and removals.. Planned and coordinated mill shutdowns, including preparation of work scopes, resource allocation, tools, rigging equipment, and specialised relining tools (e.g., hydraulic torqueing systems, liner handlers).. Enforced adherence to Mine Health and Safety Act (MHSA), risk assessments, safe work procedures, Lock-Out/Tag-Out (LOTO), and confined space entry protocols.. Oversaw removal of worn liners, inspection of mill shells, installation of new liners (rubber, composite, steel), and torqueing to manufacturer specifications.. Collaborated with maintenance planners, production teams, and engineering departments to minimise mill downtime and optimise reline durations.. Conducted pre- and post-reline inspections, quality checks, and handover procedures to ensure operational readiness and extended mill availability.. Trained and mentored reline crew members on safe work practices, proper liner handling techniques, and continuous improvement initiatives.. Managed inventory of liners, bolts, and consumables while controlling costs and reducing waste during reline projects.. Maintained detailed records of reline performance, including duration, safety incidents, and lessons learned for future shutdowns.

Reline supervisor

MVR international
Apr 2025 - Apr 2025

Supervised and actively participated in the relining of SAG, Ball, and AG mills, specialising in the safe removal and installation of rubber and composite liners.. Led teams in complete reline cycles: stripping worn rubber liners, inspecting mill shells, applying backing rubber, and fitting new liners to required specifications.. Performed hands-on tasks including liner handling, alignment, bolt torqueing, and quality checks to ensure proper fit and extended liner life.. Planned and executed mill shutdowns, coordinating tools, equipment, and crew to complete relines efficiently and minimise downtime.. Enforced safety standards including MHSA compliance, risk assessments, LOTO, confined space, and rigging procedures.. Trained team members on correct rubber lining techniques, safe handling practices, and best installation methods.. Conducted post-reline inspections and handover to production teams.

Reline supervisor

MVR International
Mar 2025 - Jul 2025

Performed hands-on relining tasks including skimming of old liners, removal of worn rubber lining, mill shell inspection, application of backing rubber, and precise installation of new rubber liners.. Led line boarding activities – installing and aligning liner boards, ensuring correct fitment, sealing, and bolt torqueing to OEM specifications for optimal mill performance.. Coordinated and executed mill shutdown schedules, managing teams of 12–25 reliners while actively working alongside the crew during skimming, stripping, boarding, and lining phases.. Enforced safety standards in line with MHSA requirements, including risk assessments, Lock-Out/Tag-Out (LOTO), confined space entry, rigging, and hot work procedures.. Conducted quality inspections during and after relining to verify liner adhesion, alignment, and torque, ensuring extended liner life and reduced wear.. Trained and mentored team members on proper skimming techniques, line boarding methods, safe liner handling, and best-practice installation procedures.. Collaborated with maintenance planners, production, and engineering teams to minimise downtime and optimise reline efficiency.

Habilidades

Project ManagementCommunicationTeamwork and CollaborationProblem-SolvingProject Planning
Publicado na CazVid - 5 de out. de 2026
Ver mais candidatos em BoksburgEm espanhol
  1. Início
  2. /Contrate em South Africa
  3. /Boksburg
  4. /Grant
Contato Grant